Tuesday 3 March 2020

Crossing the Thames at Henley



  With the River Thames running so high this is a difficult bridge to negotiate for the tall masted boats and with the load restriction on the carriageway of the bridge it is a potential bottle neck for traction engine drivers.


No comments:

Post a Comment